You are here

Engineering Tests on 5 Tower RTO

An engineering test is performed on a 5-tower RTO, and due to the results obtained (99.4% DRE), its combustion chamber set point was lowered by 25F. This will reduce gas consumption by over 0.214MCF/Hr. This may result in an annual savings that could easily exceed 1,340MCF.