You are here

Prep and Repair work on 5-Tower RTO

Over the Labor Day weekend, we prepped two 5-Tower Regenerative Thermal Oxidizers for their upcoming Engineering and EPA tests. In addition to this work, internal repair work was performed on one of the 5-tower systems to repair holes found in the plenums and duct-work during a recent internal inspection.